New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-21-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-21-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:14:42 PM
Creation date
8/15/2008 9:42:40 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Public Way Emergency Rule
Document_Date
2/25/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
practices, an right-of-way restoration included herein. EC 7.445(1) <br /> 2.C.1 A lic tion <br /> Application to use the public way under a revocable permit may be made to the staff of the <br /> City Engineer at the Permit and Information Center at 99 West 10th Avenue. <br /> 2.C.2 Plans n Drawin s <br /> Due to the I rge variety of uses for revocable permits, the plans and drawings to be <br /> required for a permit will be addressed on a case-by-case basis. Contact the staff of the <br /> City Enginee for specific requirements. <br /> 2.C.3 Revie <br /> Engineering ivision personnel have the responsibility of entering the permit information <br /> into a permit raking system, routing the applications to the various reviewing divisions, <br /> and then iss ing the permit. If aright-of--way cut permit is required in addition to the <br /> revocable per it, the right-of <br /> way cut permit must be reviewed and approved by the Utility <br /> Inspector pri r to the issuance of the revocable permit. <br /> The amount f time needed by the City of Eugene to review a revocable permit varies <br /> greatly depe ding upon the complexity of the individual permit situation. <br /> A copy of alai permits granted shall be forwarded to the Utility Inspector in Maintenance <br /> Planning to liow inspection of the right-of--way restoration and temporary traffic control <br /> measures us d. <br /> 2.D STRE T AND RIGHT-OF-WAY USE PERMITS <br /> 2.D.1 A li ation <br /> For EWEB, fr nchised utilities, and licensees, application to perform excavations within the <br /> public way m y be made to the Engineering Division at 858 Pearl Street. All other right-of- <br /> way use and ut permits are issued through Engineering staff at the Permit and Information <br /> Center at 99 10th Avenue. Applications shall be made on a standard form provided by <br /> the City. All relevant portions of application form and standard attachments must be <br /> completed pri r to submittal to the City. Incomplete applications will not be processed and <br /> will be return d to applicant. <br /> <br /> Application f r aright-of-way cut permit must be made by a representative of the owner or <br /> operator oft e facility being installed or upon which maintenance is being performed. <br /> Persons or ompanies working under contract to the facility owner or operator are not <br /> considered r presentatives of the facility owner and as such will not be allowed to apply <br /> for or be gra tad aright-of-way cut permit. <br /> Utility & R/W Per it Policy 9 02/09/98 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.