• ~ TABLE 1 EXHIBIT A {page 1 of 6) <br /> MMAR OF SYSTEMS DEVELOPMENT CHARGES <br /> r rt portation Wa tewater - city soc Wastewater - nnwMC slx Stormwater Parks <br /> Cos r trip = Cost r Equivalent Costs are based on the type of land Cost per square foot of Cost per <br /> 566 .4 Dwel ng Unit (EDU) use and, for industrial dischargers impervious surface area = Dwelling Unit = <br /> = 55 0.58. Plumbing with process flows, on the strength of $0.148. Cost per single-family E833.43 <br /> Fixtu a Unit (PFU) discharge. The rate varies by land development (SFD) with building <br /> ~ cost are 535.04_ System use. The rate for a single residential footprint <3,000 sq. ft =5475.74 <br /> ~ conn lions in River Road unit is 5302.64 or 23,000 sq. ft. = 5713.61. Per <br /> ~ /San Clara and Hwy 99 Duplex = 5951.48. For <br /> ~ area will pay 50.025 per Manufactured Home Parks = <br /> squa foot of lot area. 5249.23 per space plus cost per <br /> square foot of additional <br /> impervious area = 50.148. <br /> Nona sable Esti fed non-assessable The reimbursement portion of the Estimated non-assessable cost Unit costs for <br /> y cost lane mile cost f existing system charge is based on the net local of existing system using costs various <br /> m for II tors and using costs from equity in the regional treatment plant from "Infrastructure components <br /> arte~al ;costs of "Infra tructure and other regional assets. The Replacement Values Report". <br /> vt arterial treet lights; Repl ment Values improvement portion of the charge is <br /> ~ costj mile for Repo Charges based on current cost of capacity- <br /> U off-s~r t bicycle are n t of all federal grants enhancing projects to be constructed, <br /> path, and o tanding debt. as contained in the current Capital <br /> Improvement Program. <br /> H Levert Service Desig flow standards The service standards are secondary Design standards currently used Existing levels <br /> ~ "D" f~r Dads (675 curre t1y used by the City wastewater treatment for flows as by the City to handle afive-year of service for <br /> peal ur vehicles for va 'ous land use types. defined in MWMC's operating permit storm. various <br /> w 'per 1~ One light PFUs are determined with OEQ, and capacity enhancing components, as <br /> to ,per ~7 k hour using regon State capital improvements as listed in the esfiablished in <br /> ~ VMTIr .2268 miles Drain ge Plumbing Code. capital improvements plan adopted the Eugene <br /> if~-s eet bicycle by the MWMC. Parks and <br /> ~ 1,000 Recreation <br /> N P~ Plan. <br /> o Impr~ v meet Reim rsement charge The MWMC charge is a combined Improvement charge Improvement <br /> ~ pt Cha~e n 3 % reimbursement and improvement fee. charge <br /> ~ ~ II,r The proportion of the fee that is based <br /> I Impro ement charge on capacity enhancing improvements <br /> viV n 6 % varies over time as projects are <br /> <br /> V ~ identified, funded, and scheduled. <br /> Char for roads Charg s are on the Charges for new development, Basic SFD dwelling unit cost is Charges are <br /> and tr flights basis f EDUs or PFUs. changes in use and existing computed based upon assumed based on a flat <br /> O woul cak;ulated Existi commercial development connecting for the first 35% impervious area on 9200 rate per <br /> ~ ba trip rates Bevel ment connecting time are based on the number of Flow square foot bt. For SFDs with dwelling unit for <br /> c fors ific forth first time is charged Estimation Units (PFUs), times the 23,000 sq. ft., the cost is based all types <br /> ~ deve nt types based on average winter cost per unit of measure. A FEU is upon 1.5 times the basic SFD of residential <br /> m acco di g to month 'water based on the size of development, rate. For Duplex development, development. <br /> C. Ap d C, using consu ption, converted to and the effluent characteristics of the cost is based on 2 times the There is no <br /> E dwell ng units, gross EDUs Credit for past flow, biochemical oxygen demand basic SFD rate). The cost charge for <br /> floor r , or other trunk ewer levy payments and suspended solids for each type for a Manufactured Home Park commercial <br /> units ip rates will be granted for the local of land use. The charge for changes is computed based on assumed development <br /> capped t 10 trips charg in use and expansion of development 1,684 sq. ft. of impervious area <br /> per 1 ` square already connected to the wastewater per leasable space plus the <br /> feet dr uivalent. system are based on the net additional cost per square foot of <br /> difference in FEUs created by the all other impervious surface area. <br /> change or expansion. Credit for past All other development is charged <br /> property tax payments for debt based on actual impervious <br /> service on the regional facilities will surface area or equivalent <br /> be deducted from the charge. surface area. <br /> Note tini~tration costs are not included in the figures above. They will be added to each building permit. The administrative cost is 5.0% of the <br /> l SIbC (prior to deductio of credit). An additional $10.00 per permit MWMC administrative charge will be added to the MWMC SOC. <br /> City of Eugene S C Methodology Page 3 <br /> <br />