New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-15
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:16:45 PM
Creation date
8/14/2008 12:05:49 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
PEPI Fees
Document_Date
7/9/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> i <br /> <br /> r~~ ail <br /> ~I <br /> I Public Works <br /> i, ~ Administration Division <br /> City of Eugene <br /> 858 Pearl Street <br /> M~j OR~a,NDUM Eugene, Oregon 97401 <br /> 1 •l (541) 682-5262 <br /> (541) 682-6826 FAX <br /> Date: July 8, 1999 <br /> To: Mayor Torrey, City Council and Interested Parties <br /> From: Public Works Department <br /> Subject: Professional Services Fund Rate Setting Proc <br /> This memo pr Ivides information on the proposed changes in hourly rates for Engineering Services that <br /> will be posted my 9, 1999. Copies of both the Administrative Order and the Public Notice of the <br /> charges and a 5 day comment period are included in the Council packet. The Public Notice will be <br /> posted at City all and at the PIC. This memo is submitted to the Council at this time for general <br /> information, a d to describe the next steps in the fee-setting process. <br /> The Notice list the proposed hourly fees for Professional Service Fund personnel providing engineering <br /> services on pri ately designed and constructed public improvements. In new subdivisions, developers <br /> may request th t the City review the design and provide inspection services on street, sanitary sewer and <br /> stormwater inf astructure within subdivisions. Fees charged for these services recover the City's full <br /> costs, includin plan review, engineering, inspection and overhead costs. <br /> The developer pis responsible for actual construction of the improvements and must meet City <br /> requirements. These infrastructure improvements are later dedicated to the City for long term <br /> maintenance. <br /> City engineers g services are charged on an hourly rate basis. Under the limitations set out in Section <br /> 2.020 of the C' Code, publication of the Notice in a newspaper of general circulation is not required. <br /> However, dev lopers are provided engineering cost information before they sign any contract that <br /> requests City sign or inspection services on privately constructed projects. <br /> The Notice pr vides fora 15-day comment period. At the end of that time, the City Manager will review <br /> the comments nd prepare a final order setting the fees which will include consideration and response to <br /> any public co ments. The new hourly rates are expected to be effective August 1, 1999. No additional <br /> notification wi 1 be sent to the Council for these particular fees, as they are below the minimum level set <br /> in Section 2.0 0 for follow-up with the Council. <br /> For additional nformation on the proposed charges contact Les Lyle at 682-5243; for additional <br /> information o ,the fee-setting process contact Valerie Dixon at 682-5277. <br /> I <br /> ICI <br /> it <br /> i <br /> I~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.