<br /> I <br /> l <br /> establishme t period: <br /> 1-9 es 50.00 150.00 <br /> 10-4 trees 200.00 200.00 <br /> 50+ ees-additional fee per tree 1.00 1.00 <br /> In addition t the above fees, a security bond or cash deposit sufficient to ensure performance under <br /> the approved Street Tree Plan shall be provided to the City based on the following formula: <br /> a) <br /> plus] Measure the total length of lots within or abutting the street right of way in the <br /> area being developed. <br /> b) <br /> Subtract 15 feet for each leg of the vision clearance zone of each intersection <br /> included within the development. <br /> c) Subtract 30 feet for each residential lot or 80 feet for each commercial or industrial <br /> lot within the development (representing future driveways). <br /> d) Divide by 30. <br /> e) Multiply by 1.10 (representing the 10% anticipated tree mortality). <br /> f) Multiply by $300 for local streets or $400 for collector or arterial streets. <br /> Trees which ail during the establishment period and are replaced will extend the establishment <br /> period an add tional three years from the date of the replanting for those trees. <br /> The develope may either request the release of the security bond or cash deposit once all trees on <br /> the developm nt have completed their establishment period, or annually request the release of the <br /> security bond or cash deposit for those trees that have completed their establishment period. <br /> 3. Ci lantin O tion: <br /> Current Fee Proposed Fee <br /> Development of a Street Tree <br /> Plan Agree ent None 100.00 <br /> 50.00 None <br /> <br /> l i Exhibit A- 3 r:\adminord\fees\OOtreefeenot.wpd(02/04/00) <br /> I <br /> i <br /> i - <br /> <br />