consideratio of each of the factors at EC 5.055. Consideration of the criteria at EC 5.055 results in <br /> positive find'ngs under criteria (d), (g), (h) and (i) and, a determination that the considerations of all <br /> other criteri support the closure of Fairway Loop. <br /> <br /> i <br /> <br /> r <br /> <br /> i <br /> <br /> i <br /> <br /> I <br /> <br /> I <br /> Page 9 of 9 <br /> <br />