New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-00-13-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-00-13-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:33:25 PM
Creation date
8/14/2008 10:54:07 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Public Way Rule
Document_Date
9/27/2000
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> I <br /> <br /> I To avoid nois disturbances, normal working times for work performed under a permit shall be <br /> restricted to th hours between 7:00 a.m. and 7:00 p.m. unless otherwise specifically authorized by <br /> permit, licens , or variance. EC 4.083(g), 4.084 <br /> 3.F MAI TENANCE OF ROADWAY DRAINAGE <br /> A permittee s all maintain all gutters, ditches, and other drainage features unobstructed and free of <br /> sediment, di and debris. For curb and guttered streets the gutters shall remain unobstructed for <br /> the full depth f the adjacent curb and for a width of at least one foot in width from the face of the <br /> curb at the gu er line. Whenever a valley gutter crosses an intersecting street, an adequate waterway <br /> shall be provi ed and at all times maintained. EC 7.307 (3) <br /> 3.G TE PORARY PATCHING AND PERMANENT RESTORATION <br /> The permittee shall not open more than 4001inear feet of trench without backfilling the trench the <br /> same workin day. The permittee shall be required to backfll and patch temporarily with asphalt <br /> concrete mate ial any excavation in a vehicle traffic lane, bike lane, sidewalk, or on a bike path the <br /> same day of e cavation and shall maintain the temporary patch until the final surface repair is placed. <br /> Temporary tr ch repair shall be maintained sufficiently to prevent settlement or an irregular surface. <br /> Where it is i practicable to backfili and complete temporary surface restoration the same day of <br /> trench openin ,the permittee may seek prior written approval of the Inspector to leave a trench open <br /> overnight. ith prior written approval the permittee may leave a maximum of 400 linear feet of <br /> trench open o ernight, provided the permittee establishes and maintains barriers and warning devices <br /> to protect op n trench zones. <br /> As soon as pr cticable, but in no case greater than 60 days after completion of the permit work and <br /> at permittee's expense, permanent pavement replacement within the public way shall be completed <br /> in accordant with City Standards by a qualified contractor or by the permittee if the Inspector agrees <br /> the permitte has the required resources and trained personnel If the permittee fails to make the <br /> permanent p ement repair within the time specified, the City may make the repair and charge the <br /> cost thereof t the permittee without prior notification. EC 7.307 (1) <br /> NOTE: Th ermittee is res onsible for insurin that the Ins ector is notified one business <br /> da in adva ce of the time the ermanent re airs are to be made. <br /> The Inspect r shall maintain a file containing the location of and the permittee responsible for all <br /> temporary p ement patches. An inspection 50 days after the placement of a temporary patch shall <br /> be made wit a notification sent to the permittee requiring replacement of the temporary patch if it <br /> Utility & R/ Permit Policy <br /> Exhibit A - 3 r:\adminord\rules\OOrowrlexa.wpd{09/l3/00) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.