New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-00-13-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-00-13-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:33:25 PM
Creation date
8/14/2008 10:54:07 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Public Way Rule
Document_Date
9/27/2000
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> I <br /> <br /> I <br /> <br /> i <br /> <br /> ~ with a pressurized sprayer and shall completely overlap the exiting and new paving to ensure <br /> a com lete seal of the joint. <br /> 3.13.3 Georr>~etric Standards for Type Two Temporary Surfacing Permits <br /> 1. Mini um pavement width shall be 17 feet. <br /> 2. Mini um asphalt concrete pavement depth shall be 4 inches. <br /> 3 Mini um aggregate base depth shall be 6 inches of 3/4"-0 aggregate <br /> 4. Maxirpium slope shall be 20 degrees. <br /> 3.C INSP CTION <br /> Work under t e permit is subject to City inspection during and after completion of the work. EC <br /> 7.305 (3) <br /> A copy of th approved permit and drawings must be on the work site. EC 7.305 (2) <br /> The Inspecto shall be responsible for inspection of work performed under standard right-of--way <br /> work or cut ermits and annual permits for work within the public way. Upon request by the <br /> Engineering ivision, the Inspector may also inspect other work performed in the public way under <br /> a revocable p rmit or a public improvement permit. <br /> Upon receivi g the notice of commencement for the proposed work, the Inspector should endeavor <br /> to meet with he contractor's representative in charge of the construction at or before the commence- <br /> ment of the ork covered by the permit. At this time, the methods and planned sequence of the <br /> operations s ould be discussed, unanswered questions resolved, and agreement obtained on <br /> preexisting d~mages to facilities already in place. <br /> The Inspecto will periodically monitor operations performed by the contractor to see that work is <br /> performed a cording to the permit conditions. The work must strictly conform to the approved <br /> plans. Any c anges in the proposed facility from that shown on the approved permit must have the <br /> rp for consen of the Inspector. If a field change is approved by the Inspector, the permittee shall <br /> submit mod~,fied permit drawings which document the change. The Inspector may require the <br /> permittee to apply for a new permit if the requested change cannot be resolved by a field decision. <br /> EC 7.305 (1)~i <br /> i <br /> The Inspect r may require changes in construction technique or workmanship if hazardous <br /> conditions a e present and may halt construction if it does not conform to the approved drawings. <br /> Utility & R/Vl{" Permit Policy <br /> Exhibit A - 2~ r\adminord\rules\OOrowrlexa.wpd(09/13/00) <br /> i <br /> I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.