New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-00-26-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-00-26-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:34:20 PM
Creation date
8/14/2008 10:33:20 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Erosion Prevention Practices
Document_Date
12/15/2000
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and, e h slides, mud flows, earth sloughing, or other earth movement which leaves the <br /> prope <br /> etlands. Any parcel or portion of a parcel which meets the state or federal definition <br /> of wet ands that are under the jurisdiction of state or federal laws. Synonymous with <br /> jurisdi Tonal wetlands. <br /> et weather season. October 15 through Apri130, unless otherwise designated by <br /> the Ci Engineer. <br /> <br /> R-6.645-C Aunhicability. <br /> 1. These rules, and Sections 6.625 to 6.645 of the Eugene Code, 1971 apply to all <br /> construction r lated activities that result in any one or all of the following: <br /> 1.1 Land disturbance; <br /> 1.2 Structural development, including, but not limited to buildings, bridges, roads, <br /> and of er infrastructure; <br /> 1.3 Impervious surfaces, including, but not limited to parking lots, driveways, <br /> walkw ys, and patios; or <br /> 1.4 Dewatering. <br /> 2. No person shall engage in any const<uction related activity covered by Subsection R- <br /> 6.645-C.1 of ese Rules except as allowed by the Eugene Code 1971 and these rules. All persons <br /> shall prevent d/or control erosion, sedimentation, and other construction related impacts to <br /> stormwater q 'ty in a manner designed to meet the outcomes specified in R-6.645-D. Failure to <br /> implement m es that meet those outcomes shall subject the person to the same enforcement <br /> provisions as ose applicable to a permit holder under section 6.640 of the Eugene Code and R- <br /> 6.645 F of the es. This requirement shall be implemented through one of the following provisions: <br /> 2.1 Issuance of an Erosion Prevention Permit in accordance with Section R- <br /> 6.645- of these Rules; <br /> 2.2 For all other construction activities not subject to the erosion prevention <br /> permit requirements, compliance by property owners with the standards for preventing and <br /> contr lung erosion, sedimentation, and other impacts associated with construction site <br /> mans ment practices. The City will make information about these requirements available <br /> throu a variety of techniques, including public outreach programs, handout materials, and <br /> other ucational efforts to assist property owners in meeting this obligation. <br /> 3. Notwithstanding Subsection 1 above, the following activities are exempt from the <br /> ~?dministrati Rule - 7 <br /> r:~~a~~ ~.~aci2ro~roo> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.