New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-01-11-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-01-11-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:35:36 PM
Creation date
8/14/2008 10:07:16 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
6/29/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THIS P E PROPOSED <br /> TABLE 4 <br /> Local Wastewater Systems Development Charge Analysis <br /> 1. Analysis of System Value <br /> ;Total Replacem t Cost -Pipe $380,597,036 <br /> 'Total Replaceme t Cost -Pumping Stations $14,529,257 <br /> City Cost of futur projects within UGB $9,097,880 <br /> (Other Wastewat r Com onents $2 982 222 <br /> otal Cost of xisting Wastewater System 5407,206,394 <br /> .Analysis of A sessable Amount <br /> ize Total Cost <br /> -inch $8,647,587 <br /> to 48-inch $287 75773 <br /> otal Assessabl Cost 5296,404,760 <br /> . Capacity Info mation <br /> otal City Syste Capacity 48.9 mgd <br /> . Calculation o Wastewater SDC <br /> otal System Val ation, existing and planned $407,206,394 <br /> ost per unit of c pacify per gallon $2.07 <br /> esidential Rate tructure $273 per RDU + $0.066 per sq. ft. <br /> of loving area <br /> on-Residential R to Structure See''-Table 4A <br /> . Calculation or Reimbursement Percentage <br /> ity System Capa ity (EDUs) 48.9 mgd 100.00 percent <br /> xisting Use 21.4 mgd 43.76 percent <br /> ercent Available or New Development 27.5 mgd 56.24 percent <br /> otal Value of Res rve Capacity (value of system) 556,943,264 100.00 percent <br /> alue of Increase Capacity (cost of future projects in UGB- Master Plan) $9,097,776 15.98 percent <br /> lue of Reimburs ble Capacity (previously paid value-existing users) X47,645,488 84.02 percent <br /> <br /> s' <br /> ~i <br /> City of Euge a SDC Methodology Wastewater, Page C-4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.