FIGURE 5 <br /> R gional (MWMC) Wastewater System <br /> Level o Service Existing System Value Future System Value <br /> Impact m asurement Impact Measurement <br /> ~ Flow - ga Ions per day Present value -Liabilities, Future value of <br /> ~ BOD - po nds per day grants, and outstanding debt capacity-increasing projects <br /> ~ SS - po nds per day =Local equity from CIP <br /> i <br /> Formulas: <br /> Unit Cost of Capacity <br /> (A I component costs are added to determine the unit impact per FEU land use) <br /> The co of existing plus future system values <br /> all Gated to average and peak flow <br /> = Cost per gallon of daily flow <br /> Design flow <br /> The cos of existing plus future system values <br /> alloca ed to Biochemical Oxygen Demand <br /> = Cost per pound of daily BOD <br /> Design BOD capacity <br /> The co t of existing plus future system values <br /> (located to Suspended Solids <br /> =Cost per pound of daily SS <br /> Design SS capacity <br /> NOTE: The ost per unit of Flow, BOD, SS can be found in the current adopted SDC fee schedule in <br /> <br /> ~r°~ Appendix F. <br /> Ci of Eu ne SDC Methodolo Wastewater Pa a C- 9 <br /> tY 9 9Y 9 <br /> <br />