D Sum these amounts, to derive a total cost per FEU for a specific type of <br /> development; <br /> D Multiply the total cost per FEU for a development type by the number of FEUs fora <br /> development application. <br /> For more detailed and specific numerical data on FEU calculations, see Table 5. For <br /> formula illustrations, see Figure 5 in this Appendix. <br /> 2.2.1 MWMC Process Wastewater <br /> The MWMC wastewater SDC for development that discharges process wastewater <br /> to the wastewater system will be charged on the basis of the strength of that <br /> discharge. The rates per FEU for land uses listed in Attachment 4 of this Appendix <br /> include process wastewater charges. For uses not otherwise listed in Attachment 4 <br /> that include process wastewater, the MWMC SDC will be calculated by combining <br /> the charge for unit of development for general industrial uses, and adding the charge <br /> for the process wastewater FEU that matches the strength of the proposed <br /> discharge. The strength classes shown in Attachment 4 are the same strength <br /> classes used by MWMC in the user fee system. <br /> 2.2.2 MWMC Wastewater SDCs For All New Development with Annual Average <br /> Daily Flow Equal to or Greater than 100,000 Gallons, and for Existing Development <br /> Increasing Flow by or Greater than 100,000 Gallons per Day <br /> Before calculating the SDC for any development with an anticipated discharge of <br /> 100,000 gallons or more of sewage per day, the Executive Officer of the MWMC <br /> (EO) shall examine the developments impact on the twenty year schedule of capital <br /> projects. If one or more capacity-increasing projects will move into the 5-year CIP <br /> as a result of the development, the EO will establish new unit costs (based on the <br /> total costs of the amended 5-year CIP) upon which SDCs for all development will be <br /> calculated. If the MWMC wastewater SDC rate is modified, the modified fee will be <br /> applied to the development that caused the need for the modification and to all <br /> future development. <br /> <br /> City of Eugene SDC Methodology Wastewater, Page C- 8 <br /> <br />