New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-01-11-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-01-11-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:35:36 PM
Creation date
8/14/2008 10:07:16 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
6/29/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
METHODOLOGY: <br /> City of Eugene Systems Development Charges <br /> Appendix A <br /> Definitions <br /> Administr tive Charge: The amount charged to each development to cover the cost of <br /> developing the methodologies, providing_an annual accounting of system development charge <br /> expenditur s, implementation and operational costs associated with the SDC program. <br /> Accessory Dwelling Unit: As used in the determination of SDC rates, an accessory dwelling unit <br /> is any addit onal residential dwelling unit added to a development site. <br /> Acquisitio Costs: The indirect or direct amount expended to procure use, possession, rights, <br /> or title as lated to the construction of public improvements. This cost may be determined by <br /> current ma ket experience, or other reasonable and prudent methods approved by the City <br /> Engineer. <br /> Assessabl Costs: The amount of capital improvement costs which are collected through the <br /> City's local mprovement assessment program as established in City code. This cost has been <br /> removed fr m the total cost of capital improvements in determining the system-specific SDC. <br /> Average C st Determination: <br /> • The a erage cost of inspecting and installing connections with the wastewater facilities and <br /> <br /> ,,,„a with t e stormwater facilities, which are not part of the SDC as defined in E.C. 7.010, is the <br /> conne tion permit fee established by the City. <br /> • If an a plicant to connect to a wastewater or stormwater facility would result in extraordinary <br /> cost o inspecting and installing the connection, nothing in this definition shall prevent the City <br /> from r quiring the applicant pay such costs. The extraordinary costs may be paid by the <br /> applic nt in installments as part of the SDC. <br /> Average FI w: The typical average daily flow of development, by type of land use. For purposes <br /> of calculatin the Metropolitan Wastewater Management Commission SDC, this flow is expressed <br /> in terms of unit of development. <br /> BOD: Bioc emical Oxygen Demand. The quantity of oxygen utilized in the biochemical oxidation <br /> of organic atter. <br /> City Manag r: City Manager or designee. <br /> City Engin er: City Engineer or designee. <br /> City Traffic Engineer: City Traffic Engineer or designee. <br /> Constructi n Costs: The cost in current fiscal year dollars for construction of future capital <br /> improveme ts. <br /> City of Eug ne SDC Methodology Definitions, Page A-1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.