TABLE 2 <br /> Potential Impact Reduction and Credits for Systems Development Charges I <br /> <br /> **NOTE: List of possible examples; eligibility depends on compliance with criteria in SDC <br /> Policies and Procedures document. <br /> 1. Trans ortation S stem <br /> REDUCTIONS: <br /> Successful bus pass program for employees <br /> CREDITS: <br /> Residential: <br /> Street widths > 36 Feet <br /> Commercial/Industrial: <br /> Street widths > 44 feet <br /> Off-site, non-contiguous intersections for arterial and collector streets <br /> Transit shelter and pullout <br /> Street lights on arterial and collector streets <br /> Off-site right of way and easement acquisition <br /> Traffic signals <br /> Off-street bicycle paths identified in TransPlan or other City plans <br /> Offsite ublic im rovements where a uivalent assessments can be collected <br /> 2. Wastewater S stem v <br /> CREDITS: <br /> Public Wastewater collection lines > 8-inch diameter <br /> Public pump stations and pressure lines that serve more than the development <br /> Offsite public sewer improvements, where equivalent assessments can be collected <br /> Prior Pa ment of Metro olitan Wastewater Service District debt service <br /> 3. Stormwater S stem <br /> REDUCTIONS: <br /> Retention system (e.g. Drywells, infiltration trench) <br /> CREDITS: <br /> Stormwater collection lines > 24-inch and < 60-inch in diameter <br /> Major drainage channels: construction and off-site easement <br /> Offsite public improvements where equivalent assessments can be collected or that benefit <br /> existin develo ments <br /> 4. Parks S ~ stem <br /> CREDITS: <br /> Land dedication (for sites accepted by City, consistent with adopted City Plans) <br /> On-site park facility dedication (for improvements accepted by City, consistent with adopted <br /> Cit Plans <br /> City of Eugene SDC Methodology Page 16 <br /> <br />