New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-01-18
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:35:53 PM
Creation date
8/14/2008 10:07:15 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
ROW Permit Fees
Document_Date
1/30/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
= r <br /> 5. Providers have the option of obtaining individual right-of--way cut permits for each excavation activity <br /> performed within the right-of--way or obtaining an annual blanket permit which covers many activities <br /> associated with maintenance and minor installations within the right-of--way. The regulations pertaining to <br /> the annual blanket permit program are contained within Administrative Rule R-7.302-A-2. <br /> 6. Individual Permit Costs for collector streets and alleys aze chazged the same as local streets. <br /> 7. Individual Permit Costs for Public Utility Easements (PUE) abutting street right-of-way shall be chazged <br /> at the same rate as if the placement had been in that right-of--way. PUEs not abutting street right-of--way <br /> shall be charged at the rate for local streets. , <br /> Other: . <br /> <br /> Exception permit for cutting street less than five years old: $1,000 <br /> Exhibit A - 2 <br /> C:\WINDOWS\TEMP\Ol UtilityROW-E~cA.wpd <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.