New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-03-13-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-03-13-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:40:01 PM
Creation date
8/13/2008 1:35:40 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Streetlight Design Standards
Document_Date
8/4/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
materi /equipment being installed on the project; and, <br /> 5. S A bond, or other security acceptable to the Ci has been submitted to the <br /> <br /> ~ City; d <br /> 5.6 A copy of the approved electrical permit issued by the City's Building Permit <br /> Servic <br /> 6. Commencement of Other Public Improvements. If the applicant has not yet <br /> obtained the ecessary utility concurrences, but has met all other requirements associated with the <br /> proposed pu ~c improvement project, the City will allow the applicant to commence construction <br /> of the public treet provided the following conditions are met: <br /> 6.1 The applicant has submitted copies of applicant's communications with <br /> affect d utility companies concerning determinations of service locations, which shall be <br /> sho on the plans, together with the name and telephone numbers of the utility company's <br /> cont s; and, <br /> 6.2 The street lighting plans are complete, lacking only utility concurrences; and, <br /> 6.3 The applicant has provided the name of the contractor, the contractor's <br /> sch e, the engineer's cost estimate or a copy of the actual contract with the contractor; <br /> and, <br /> 6.4 An approved description sheet (blue/green cut sheet) for all <br /> mat 'als/equipment being installed on the project; and, <br /> 6.5 A bond, or other security acceptable to the City to cover all construction and <br /> eng' ering costs associated with completion of the street light work, which bond or other <br /> sec shall remain in effect for a one year warranty period after completion of the <br /> cord coon. <br /> 7. Releasin,~ the Bond. City staffshall f <br /> le the Engineering and Construction Agreement <br /> and bond w h the City Recorder. City staff shall monitor construction and place the project on <br /> warranty wh it is certified to be complete. The applicant's bond wrll be released by the City at the <br /> end of the o e year warranty period, providing all deficiencies have been corrected. <br /> 8. Costs of Review. The applicant shall be responsible for payment of actual City costs <br /> incurred wit respect to plan review, processing, inspection, material testing, and other engineering <br /> services ass ciated with the permit application; the costs shall be based on the engineering services <br /> fee schedule ' effect at the time the services are performed. The City shall bill the applicant monthly <br /> for services ormed. Failure of the applicant to pay the amount billed when due may result in <br /> discontin ce of further processing of the permit application by the City. <br /> Adnvnistrat a Order - 4 <br /> C:\TEA~fPti03s@igh ao,wpd(07/30/03) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.