'~q,~,~~ <br />h Street to Hilvard Street <br /> <br />_. .. F?F~OJECT JU. STIFICA,ThON _ .. _, _ <br />In 2000, the General Services Administration selected the former AgripaUChiquita cannery site at 8th Avenue and Ferry Street as the location for a new <br />Federal Courthouse in Eugene. The Federal Courthouse is seen as an integral component of the community's vision for this underutilized industrial area <br />on the edge of downtown; a vision of a new moved-use district along 8th Avenue, leading from the heart of downtown to the Willamette River. In 2002, <br />the Eugene city council adopted a concept plan for the federal courthouse district, based on four main goals: create a special place around the court- <br />house; conned to the core of downtown; contribute to the vitality of the downtown core; and conned downtown to the river, in a memorable and <br />accessible way. The concept plan focuses on providing new transportation routes and pedestrian crossings to create a special place by the new <br />federal courthouse and to make the connection between downtown and the river. <br />CumeMly, the courthouse district is isolated from downtown by a Marge volume of traffic, representing both local trips to downtown Eugene and through <br />traffic on State Highway 99. Highway 99 is routed through this section of the city over several d'rfferent street segments, including Franklin Boulevard <br />from Interstate 5 westerly to Alder Street, then on a portion of East Broadway to Mill Street, akx~ MiN Street to the 6th/7th Avenue couplet, and <br />continuing west on 6th Avenue with the parallel eastbound movement on 7th Avenue. <br />The proposed project envisions rerouting a major portion of non-bcal traffic (westbound state Hwy. 99 thnwgh movement that now occurs via <br />Broadway and Mill Street to 6th Avenue) to a new link nrnning from ttie Hilyard and Broadway intersection to 6th Avenue at High Stmt. This removal <br />of traffic vdume from the Mitl Street and 8th Avenue intersection would enable a reconfiguration of that irrtersection to provide an east/west crossing <br />for pedestrians and vehicles, facilitated by a new tratt'ic signal. <br />In addition th the highway projects. some local improvements would include the recrorrstruction of 8th Avenue from Mill Street to the crossing at the <br />railroad, reconstruction and partial realignment of Ferry Street from Broadway to 8th Avenue, along with cone-block extension of Feny Street horn 8th <br />„Avenue to the new ORE 99W segment parallel to the tracks. Ferry Street and 8th Avenue will be rebuilt as urban, pedestrian-friendy streets that will <br />provide local access to all modes of travel within the r~urthouse district. Fast Broadway wilt be entranced by removal of a Large portion of westbound <br />traffic flow between Hilyard and Mill Streets, making it possible to remove one or more vehicle travel lanes and restoring parking or enhancing other <br />competing uses within the existing right of way. <br />RESPONSIBLE LOCAL OFFICE TO BE CONTACTED FOR THE FOLLOWING ACTMTIES: <br />1. Public Hearing / <br />Citizen Involvement (Office) <br />2. Environmental /Planning (OfFice) <br />3. Pre-Engineering (Office) <br />THIS OFFICIAL REQUEST IS FROM: <br />The City of Eugene <br />By Mark Schoening, City Engineer <br />By Kurt Corey, Public Works Director <br />and/or <br />2 <br />(Phone) <br />(Phone) <br />(Phone) <br />County <br />By <br />By <br />~o ~6, <br />