8 Historic Property Alteration Permit is in progress; appeal period will expire 3/10 at 5:00 PM. <br /> 9 Russ applied for Union Pacific Temporary Use permit and Parallel Piping Encroachment permit. <br /> 10 Russ shipped plans specs and estimate docs for the Depot Rehab to ODOT 3/5/03 for the 90% review. <br /> 11 The project budget includes amounts for a variety of Owner-managed improvements in addition to the <br /> "ODOT contract for the Depot Rehab. <br /> 12 SHPO concurs with the Finding of Effect that the rehab will have no adverse effect on the station. <br /> 13 Russ M has been working with Seward Meintsma and Peder Allison of PWE for the design and timing of the <br /> Willamette St. Storm line extension. <br /> 14 Russ to meet with George Jessie and Diamond to have the pay-box moved as well as bollards, signposts, and <br /> raised islands removed to allow the storm project work and for circulation during construction. <br /> 15 Russ to coordinate for Amtrak moving, with security system, phone system, data. cabling, to Temp station <br /> and back. <br /> 16 A separate asbestos abatement contract will be let to abate asbestos in the existing Amtrak station ceiling <br /> plaster after Amtrak is moved into the temporary station, and before the actual rehab can commence. <br /> 17 George Jessie managing parking in City possession area. Diamond hasn't paid Jenova or the City until the <br /> City (George) and a rep from Jenova and Diamond can get together to clarify how to divide spaces. We will <br /> probably settle up in June. <br /> End of notes <br /> The Depot web page is http://www.ci.eugene.or.us/ASD/facilities/depot/intro index.htm <br /> <br /> 04/14/03 Central Services -Facility Management Eugene Multi-modal Transit Station Page 2 of <br /> 1 <br /> <br />