New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Endangered Species Act
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Endangered Species Act
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:42 AM
Creation date
8/6/2008 9:49:05 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Stormwater
PW_Subject
Endangered Species Act
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Strategy I. Conduct a Willamette River Floodplain Acquisition Study <br /> Strategy: Conduct a review of privately-owned parcels within the Willamette River floodway and <br /> floodplain for possible acquisition from willing sellers. Include research on potential funding sources for <br /> acquisition. If possible, conduct in conjunction with the Metropolitan area US Army Corps waterways <br /> study currently being discussed with the Corps. <br /> Responsible work unit: Public Works, Engineering <br /> Progress to date: This strategy has not been funded to date. Staff are evaluating this strategy to <br /> determine whether it can be added to the Metro Waterways Study, and what resources can be <br /> applied to the required local match. <br /> Strategy J. Conduct Monitoring and Evaluation Studies <br /> Strategies: <br /> a. Establish systematic and consistent program for sampling of biological indicators of <br /> stream health (e.g., fish presence surveys, macro-invertebrate surveys). <br /> b. Continually review and evaluate maintenance practices to reduce environmental impacts. <br /> c. Periodically review and evaluate effectiveness of salmon protection and recovery <br /> implementation measures. <br /> <br /> Responsible work unit.• Not assigned. <br /> <br /> Progress to date: None. <br /> If you have additional questions or need more information, contact Tom Coyle at 682-6077 <br /> (tom.g_co~(a~ci.eugene.or.usl or Kurt Corey at 682-5241 (k~rt.a.corevnci.eugene.or.usl. <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.