DISCUSSION DRAFT -FOR THE PURPOSES OF INITIAL DISCUSSION, NOT <br /> PROPOSED FOR ACCEPTANCE <br /> B. At the most appropriate point upflow from the point of connection, Coburg will install <br /> and maintain a monitoring station, which monitoring station shall be able to accommodate <br /> flow volume measuring devices and provide opportunities for sampling to allow monitoring <br /> of the amount and contents of the wastewater being transferred to the MWMC system. <br /> C. Coburg will measure the volume of flow through the monitoring station called for by this <br /> agreement, and will take regular samples to ascertain the quality of the wastewater flowing <br /> through the monitoring station. Coburg will report flow volumes to MWMC on a daily basis. <br /> Sampling frequency and constituents for analysis will be determined jointly between Coburg <br /> and MWMC staff. Coburg will report any unusual flows or wastewater content to MWMC as <br /> soon as the situation is discovered. <br /> D. Coburg shall have responsibility for construction, maintenance, repair and operation of <br /> the entire Coburg wastewater system up to the point of connection with the MWMC system. <br /> Section 6. Initial Steps to be secured prior to first transfer of wastewater <br /> A. Coburg will adopt a rate structure that parallels the rate system for MWMC and includes <br /> MWMC rates for all classifications (strengths) of users. Coburg's rate structure will also <br /> include cost recovery for all aspects of operation of the Coburg collection system and <br /> transmittal of wastewater to the MWMC system. Coburg will consult with MWMC on the <br /> classification of all Coburg users at the time of initial connection and thereafter. Coburg will <br /> establish and maintain monthly sewer billing system, charging users based on strength <br /> characteristics asdetermined byCoburg inconsultation with MWMC. <br /> B. Coburg shall engage and retain personnel with the training and experience to operate and <br /> maintain a wastewater collection system. Among the personnel utilized, Coburg shall <br /> include personnel holding Wastewater Collection System Operator certification at a level as <br /> required by state regulations. <br /> 1 <br /> C. Coburg will adopt an industrial pretreatment ordinance prior to the initiation of <br /> wastewater service with MWMC. The Coburg pretreatment ordinance will comply with all <br /> state and federal regulations and will include all MWMC pretreatment program requirements. <br /> D. Coburg shall adopt a systems development charge program, governing all users that <br /> connect to or use the Coburg wastewater system after the date of the original connection of <br /> Coburg's system to MWMC. The initial Coburg SDC shall include a charge equal to three <br /> percent more than the then current MWMC SDC. The Coburg SDC may include other <br /> charges for the Coburg system, as allowed by law. <br /> j. <br /> E. Coburg shalladopt a wastewater treatment ordinance similar to those in place in the city <br /> of Eugene and the city of Springfield. Such an ordinance shall require all properties within ~ <br /> Coburg city limits to connect to the Coburg system at the time of initial development of the <br /> r <br /> i <br /> <br /> DRAFT - IGA for Coburg - MWMC DRAFT Page 5 <br /> o c <br /> <br />