New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Coburg Connection MWMC
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Coburg Connection MWMC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:12 AM
Creation date
8/6/2008 9:48:40 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
AIS
PW_Subject
Coburg Connection - MWMC
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 'DISCUSSION DRAFT -FOR THE PURPOSES OF INITIAL DISCUSSION, NOT <br /> PROPOSED FOR ACCEPTANCE <br /> Coburg system or prior to occupancy of the property. The ordinance will include sewer <br /> design and construction standards consistent with Eugene and Springfield standards. <br /> E. At the time the construction of the connection point has been completed and all other <br /> .obligations set forth in this section are completed, MWMC shall accept for processing all <br /> wastewater delivered by Coburg to the point of connection. <br /> Section 7. Ongoing Operations. <br /> A. Coburg will remitthe MWMC treatment portion of the Coburg sewer charges to MWMC <br /> within ten days of the first of each month. The monthly obligation will be calculated based <br /> on the monitored flow at the point of transfer from the Coburg system to the MWMC system. <br /> B. Coburg will make all necessary amendments to its pretreatment ordinance to maintain <br /> .wastewater quality standards at the same levels and character as those established by <br /> ordinances of MWMC members. Coburg will enforce its pretreatment ordinance through <br /> inspections, monitoring and other actions required by MWMC's pretreatment program. <br /> C. Coburg will establish and maintain a profile of current users, :and make this list and all <br /> .other aspects of Coburg's discharge limitation program available to MWMC for inspection at <br /> any time. Coburg will participate in all pollution management practices programs, will adopt <br /> all relevant standards and guidelines and will encourage all users to limit discharges, and <br /> mandate compliance if discussions between MWMC and Coburg determine that such <br /> mandate is necessary to achieve or maintain compliance with DEQ regulations or other <br /> requirements. <br /> D. Coburg will monitor flows and conduct regular testing for all measurable attributes of the <br /> MWMC NPDES permit. Coburg will participate with MWMC in all programs to encourage <br /> users tocontroldischarges, and will undertake enforcement actions in the event that any <br /> inappropriate actions are traced to Coburg. <br /> E. At any time after the connection between the Coburg system and MWMC is established <br /> when any property within the Coburg Urban Growth Boundary, as it then exists, establishes a <br /> new connection or a change in use of an existing connection such that a systems development <br /> charge is owed under the MWMC criteria which are adopted and made a part of the Coburg <br /> SDC rules, Coburg shall levy an SDC charge for the new use in an amount at least equal to <br /> an equivalent MWMC SDC charge. Such a charge must be paid in full, or have satisfactory <br /> .arrangements for payment secured, prior to occupancy of the use, or prior to the practical <br /> availability of the connection to the Coburg system. Coburg shall remit to MWMC that <br /> portion of the Coburg SDC that is the equivalent amount for an MWMC SDC for a like user <br /> within the MWMC jurisdiction in a manner similar to the process used by the Cities of <br /> Springfield and Eugene. With this transmittal Coburg shall supply MWMC with any <br /> information MWMC requests regarding the amount and type of use subject to an SDC. If <br /> Coburg or MWMC later discovers an error in the Coburg SDC remittal, the party discovering <br /> the error shall immediately bring it to the attention of the other party. Where possible the <br /> error will be corrected through direct payment to correct the error. Where such direct <br /> DRAFT - IGA for Coburg - MWMC DRAFT Page 6 <br /> ~ ~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.