<br /> DISCUSSION DRAFT -FOR THE PURPOSES OF INITIAL DISCUSSION, NOT <br /> PROPOSED FOR ACCEPTANCE <br /> payment is not possible, theparties will, develop a system of credits or installment.payments <br /> 'to correct the error. <br /> F. MWMC will inform Coburg of any planned changes to its SDC rates. Coburg, and the <br /> property owners of Coburg, shall have the. same rights of comment as other property owners <br /> within the MWMC service area. MWMC will notify Coburg of any changes. in the MWMC <br /> SDC charges within 30 days of the completion of the process. Coburg shall reflect these <br /> changes in Coburg's SDC as soon as allowed by law. <br /> G. Coburg will take all appropriate steps to ensure the integrity of the Coburg wastewater <br /> system to protect against inflow and infiltration (I & I) and related peak wet weather flow'. <br /> problems, including adoption of the MWMC wet weather flow management program. <br /> Coburg shall establish and enforce high standards for constructing and development of <br /> wastewater connections or additional wastewater collection facilities.. Such standards shall <br /> be equivalent to or more stringent than standards adopted by MVVNIC members, Coburg. <br /> agrees to adopt and implement any I&I policies and programs adopted by an MWMC <br /> member where such a program. would reduce oreliminate I & I problems in the Coburg <br /> system. <br /> Additional provisions <br /> 1 Coburg will indemnify and hold harmless MWMC for all liability or claims of liability for <br /> any incident, claim or alleged claim related to the operation of the Coburg wastewater <br /> system, specifically including all portions of the system within the Eugene-Springfield Urban <br /> .Growth Boundary upstream of the connection point. Coburg will indemnify and hold <br /> harmless the City of Eugene, the City of Springfield and Lane County for all liability or <br /> claims of liability for any incident, claim or alleged claim related to the operation of the <br /> ecificall includin all ortions of the s stem within the <br /> Coburg wastewater system, sp y g p y <br /> Eugene-Springfield Urban Growth Boundary, upflow of the connection point.. <br /> 2 Coburg will indemnify and hold harmless MWMC for any loss or damage to the MWMC I <br /> system resulting from negligent or more culpable acts. on the part of Coburg or Coburg <br /> ersonnel. The obli ation of indemnification does not include claims arisin after normal i' <br /> p g g <br /> mixing of Coburg's wastewater with MWMC system, unless those relate to failures to <br /> comply with specified standards jointly agreed to by MWMC and Coburg at the time of the ~ <br /> original connection. MWMC will hold the City of Coburg harmless for any loss or damage <br /> to the system, and'to legal challenges for any aspect of the operation of the MWMC system j <br /> .for all aspects of the operation of the system down stream of the point of Coburg's; , <br /> connection to the MWMC system. <br /> 3 MWMC shall have, and all Coburg ordinances and regulations concerning the operation of <br /> the Coburg wastewater system will include, directly or indirectly, provisions providing that <br /> MWMC shall have all possible rights to take protective or remedial action against any user of <br /> `the Coburg wastewater system that has taken or appears likely to take any action that will <br /> .adversely affect the operation of the MWMC system. Coburg shall provide MWMC all. j <br /> appropriate assistance in any such action. <br /> DRAFT - IGA for Coburg - MWMC DRAFT. Page 7 <br /> 3-8 <br /> _ _ _ <br /> <br />