<br /> DISCUSSION DRAFT -FOR THE PURPOSES OF INITIAL DISCUSSION, NOT <br /> PROPOSED FOR ACCEPTANCE <br /> `Coburg system or prior to occupancy of the property. The ordinance will include sewer <br /> design and construction standards consistent with Eugene and .Springfield standards. <br /> E. At the time the construction of the connection point has been completed and all other <br /> obligations set forth in this section are completed, MWMC shall accept for processing all <br /> wastewater delivered by Coburg to the point of connection. <br /> Section 7. Ongoing Operations. <br /> A. Coburg will remit the MWMC treatment portion of the Coburg sewer charges to MWMC <br /> within ten days of the first of each month.- The monthly obligation willbe calculated based <br /> on the monitored flow at the point of transfer from the Coburg system to the MWMC system. <br /> B. Coburg will make all necessary amendments to its pretreatment ordinance to maintain <br /> wastewater quality standards at the same levels. and character as those established by <br /> ordinances of MWMC members. Coburg will enforce its pretreatment ordinance through <br /> inspections, monitoring and other actions required by MWMC's pretreatment program. <br /> C. Coburg will establish and maintain a profile of current users, and make this list and all <br /> other aspects of Coburg's discharge limitation program available to MWMC for inspection at <br /> any time. Coburg will participate in all pollution management practices programs, will adopt <br /> all relevant standards and guidelines and will encourage all users to limit discharges,. and <br /> mandate compliance if discussions between MWMC and Coburg determine that such <br /> mandate is necessary to achieve or maintain compliance with DEQ regulations or other <br /> requirements. <br /> D. Coburg will monitor flows and conduct regular testing for all measurable attributes of the <br /> MWMC NPDES permit. Coburg will participate with MWMC in all programs to encourage <br /> .users to control `discharges, and will undertake enforcement actions in the event that any <br /> inappropriate actions are traced to Coburg. <br /> E. At anytime after the connectionbetween the Coburg system and. MWMC is established <br /> when an roperty within the Coburg Urban Growth Boundary, as it then exists, establishes a <br /> Yp <br /> new connection or a change in use of an existing connection such that a systems development <br /> `charge is owed under the MWMC criteria which are adopted and made a part of the Coburg <br /> SDC rules, Coburg shall levy an SDC charge for the new use in an amount at least equal to I' <br /> an equivalent MWMC SDC charge. Such a charge. must be paid in full, or have satisfactory <br /> arrangements for payment secured, prior to occupancy of the use, or prior to the practical <br /> availability of the connection to the Coburg system. Coburg shall remit to MWMC that <br /> portion of the Coburg SDC that is the equivalent amount for an MWMC SDC for a like user <br /> within the MWMC jurisdiction in a manner similar to the process: used by the Cities of <br /> .:Springfield and Eugene. With this transmittal Coburg shall supply MWMC with any <br /> information MWMC requests regarding the amount and type of use subj ect to an SDC. If <br /> Coburg or MWMC later discovers an error in the Coburg SDC remittal, the party discovering <br /> the error shall immediately bring it to the attention of the other party; Where possible the. <br /> error will be corrected through direct payment to correct the error.. Where. such direct <br /> DRAFT - IGA for Coburg - MWMC DRAFT Page 6 <br /> 3 7 <br /> <br />