Public Buildings and Facilities <br /> <br /> Building Service Systems Preserve and maintain building service systems, including elevators, mechanical <br /> systems (plumbing, heating, cooling) needed. to maintain reasonable service <br /> levels. Program includes electrical systems necessary for lighting, equipment <br /> and computers. <br /> Plan/Policy Document: Facility Condition Report, Uniform Building Code <br /> Total Project Cost: $2,789,000 <br /> EPAC Garage Stair Repair Repair and seal stairs. Patch cracks, repair spalls and repair glass block masonry. <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $15,000 <br /> EPAC Garage Waterproofing Replace waterproofing membrane on all levels; clean and seal all decks and <br /> walls. <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $460,000 <br /> Health,, Safety & Welfare Preserve and maintain the health, safety and welfare of users of City facilities, <br /> including asbestos abatement, air quality and building safety programs designed <br /> to protect the public and employees. <br /> Plan/Policy Document: Facility Condition Report, Uniform Building Code <br /> Total Project Cost: $1,426,000 <br /> Library Parking Repair Crack repair and painting of parking level walls and ceilings. <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $35,000 <br /> Overpark Waterproofing Replace waterproofing membrane at all levels; repair"cracks in walls; pressure <br /> wash and seal walls and facades. <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $325,000 <br /> Parcade Preservation & Clean and seal walls; pressure wash entire structure. <br /> Maintenance <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $30,000 <br /> City of Eugene 2004-2009 Capital Improvement Program <br /> 3 <br /> <br />