Public Buildings and Facilities <br /> <br /> .Table of Funded Projects <br /> (Figures in $1000's) <br /> 2004 2005 2006 2007 2008 2009 Total <br /> Preservation/Maintenance <br /> Broadway Place Garage Preservation 65 65 <br /> Building Service Systems 440 457 473 473 473 473 2,789 <br /> EPAC Garage Stair Repair 15 15 <br /> EPAC Garage Waterproofing 460 460 <br /> Health, Safety & Welfare 225 233 242 242 242 242 1,426 <br /> Library Parking Repair 35 35 <br /> Overpark Waterproofing 325 325 <br /> Parcade Preservation & Maintenance 30 30 <br /> Pearl St. Garage Preservation & Maintenance 40 40 <br /> Pearl Street Garage Waterproofing 150 150 <br /> Primary Building Systems 1,341 1,387 1,433 1,433 1,433 1,433 8,460 <br /> PWM Building 6 Expansion 600 600 <br /> Secondary Building Systems 102 106 109 109 109 109 644 <br /> . _ Subtotal 2,598 2,823 2,812 2,292 2,257 2,257 15,039 <br /> Site and Facility Improvements <br /> ADA Renovations 207 215 222 222 222 222 1,310 <br /> Atrium Building Improvements 140 140 140 150 570 <br /> Elevator Fire Recall in Parking Garages 60 60 <br /> General Site & Facility Improvements 284 293 302 302 302 302 1,785 <br /> Subtotal 691 648 664 674 524 524 3,725 <br /> tTotal 3,289 3,471 3,476 2,966 2,781 2,781 18,764 <br /> tThese totals are not fund-specific and include all programmed funds. For information about specific funds and detailed project funding for <br /> FY2004 and FY2005 , refer to the Two Year Fund Detail on the previous page(s). <br /> Description of Funded Projects <br /> Preservation/Maintenance <br /> Broadway Place Garage Repair cracks in deck; paint interior. <br /> Preservation <br /> Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br /> Total Project Cost: $65,000 <br /> City of Eugene 20042009 Capital Improvement Program <br /> 2 <br /> r <br /> <br />