New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Dearbrook PUD
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Dearbrook PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:21 AM
Creation date
8/6/2008 9:47:51 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Engineering
PWA_Project_Area
Development
PW_Subject
Green Valley Glen PUD/Dearbrook PUD
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1. Test Boring Location <br /> Borehole Depth Diameter <br /> No. Location (fleet) (inches) Remarks <br /> Mud <br /> BH-1 On West Amazon Drive, ±0.4 mile NW 80 6 Rotary/ <br /> of intersection with Fox Hollow Road Rock core <br /> boring <br /> Mud <br /> BH 2 On Dillard Road, ±250 feet south of 80 6 Rotary/ <br /> intersection with Hunters Glen Drive. Rock core <br /> boring <br /> Mud <br /> BH-3 On Dillard Road, ± 700 feet south of 80 6 Rotary/ <br /> intersection with Hunters Glen Drive Rock core <br /> boring <br /> Mud <br /> BH-4 On Dillard Road, ± 1700 feet uphill of 80 6 Rotary/ <br /> intersection with Hunters Glen Drive Rock core <br /> boring <br /> <br /> TRAFFIC CONTROL <br /> <br /> We anticipate our test borings to be in the city right-of-way, on the shoulder of the road <br /> <br /> for each site. Equipment and personnel will not be in the roadway lanes of traffic. We <br /> <br /> will provide traffic control, consisting of traffic cones surrounding our work area and <br /> <br /> traffic signage as shown in the attached diagram, No. 210 from the 2006 ODOT <br /> Temporary Traffic Control Handbook. <br /> DRILLING SCHEDULE <br /> <br /> We anticipate initiating drilling on Monday, 10/29/07. This start date is contingent upon <br /> approval of our access permit. Drilling will be conducted in 4-5 days, depending on <br /> drilling and the conditions encountered. <br /> Thank you for your assistance with our permit application. Please contact me at <br /> 503-643-1541 once the permit is approved, or if you have any further questions. <br /> Green Valley Glen PUD and Dearbrook PUD October 17, 2007 <br /> Work Plan Project 2071097 and 2071098 <br /> Eugene, OR 2. Harrang, Long, Gary, and Rudnick P.C. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.