New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Acquisition Amazon Headwaters
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Acquisition Amazon Headwaters
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:56:23 AM
Creation date
8/6/2008 9:47:47 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
POS
PWA_Project_Area
AIS
PW_Subject
Acquisition Update on East Fork Amazon Headwaters-Dillard Road
Document_Date
9/26/2008
External_View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/01/04 WED 16:24 FAX 541 682 4882 EUGENE PW MNTNC & POS I~]003 <br /> <br /> • . ~ • <br /> 5) City would recpgnize the West Amazon alignment.as part of Ridgetine Trail system, <br /> and standard sigrtage should be erected at the West Amazon/Martin intersection. <br /> 6) Canyon Drive itrail section would be considered a neighborhood connector to the main <br /> Ridgetine Trail system. <br /> ~ Canyon Drive section would follow a creek side alignment rather than a scope traverse <br /> . alignment, for be~t•visitor experience and least erosion/sedimentation risk. • - <br /> 8) Since bridge cptu-traction costs could limit the viability of a creekside alignment for the <br /> Canyon Drive segttion, SEN pledges skilled volunteer labor for bridge design and <br /> constriction, suitable to meet city engineering standards. <br /> 9) Trail-building efForts on the upper Headwa#ers Trail section and the Canyon Drive <br /> section should be~proceed in parallel with signage improvements and neighborhood <br /> maintenance of tt~e West Amazon section. <br /> _ 10) .Immediate neighbors, who have been concerned about the environmental and cufiural <br /> impacts of a Canyion Drive terminus for the Headwaters Trail, are endorsing this proposal <br /> as appropriately moderating those impacts. . <br /> Thank you again i~r your consideration of these points. We look forward to mutual <br /> adcnowtedgemer~ that this approach defines a Hnn-win proposition with consensus support, <br /> to result in timely pnd appropriate Amazon Headwaters Trait development. <br /> Respectfully, - <br /> Kevin Matthews <br /> President h ; Neighbors - <br /> . r i . i <br /> . fJ i <br /> • <br /> Devi Monk <br /> ice President, Southeast Neighbors <br /> www.Southeas3Kei4hbors.org page 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.