New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Green Valley Glen PUD
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Green Valley Glen PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:58:16 AM
Creation date
8/6/2008 9:47:45 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
POS
PWA_Project_Area
Stormwater
PW_Subject
Testimony for Green Valley Glen PUD Public Hearing
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alternatives <br />This chapter describes the two alternatives for this project, as well as an alternative that was <br />identified but eliminated from detailed study. The chapter concludes with a comparative summary <br />of the environmental consequences of the two analyzed alternatives. <br />Alternative 1 (Proposed Action) <br />Under Alternative 1, the City of Eugene Parks and Open Space Division in partnership with The <br />Nature Conservancy, the McKenzie River Trust and Oregon State Parks and Recreation would <br />purchase fee title to Dillard Hollow in its entirety. The 38.4 acre parcel will be owned by the City of <br />Eugene and protected as open space under the stewardship of the Parks and Open Space <br />Division. <br />Altemative 2 (No Action) <br />Under this alternative, the City of Eugene and partners will not purchase Dillard Hollow. The <br />property will remain in private ownership leaving it vulnerable to development. It is anticipated that <br />the property will be subdivided-into 77-115 home sites with developed road and utility <br />infrastructure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.