New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1999
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:46:39 PM
Creation date
8/5/2008 2:06:07 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ i <br /> September 17, 1 99 <br /> CONTACT: Ne Nabeta, Facilities Project Manager, 682-2708 <br /> <br /> !From Public Inf rmation Section, 682-5523 <br /> <br /> .FOR IMMED TE RELEASE <br /> EVENTS S OWCASE IMPROVEMENTS AT SHELDON AND ECHO HOLLOW POOLS <br /> Open ho se events are scheduled at Sheldon and Echo Hollow pools on Friday, September 24, to - <br /> showcase recent improvements to the City of Eugene public swimming pools. The open house at <br /> <br /> !Sheldon Pool, 2 43 Willakenzie Road, is scheduled to run from 11 a.m. to noon and will highlight <br /> <br /> II accessibility and energy conservation improvements at the pool. At Echo Hollow Pool, 1655 Echo <br /> <br /> ~I Hollow Road, th open house will run from 1 to 2 p.m. with a focus on newly constructed energy- <br /> conservation im rovements. <br /> <br /> ~ In work ust completed at Sheldon Pool, a new accessibility bay has been constructed in the <br /> shallow end of t e lap pool The stair bay was built using funds provided at the recommendation of the <br /> Eugene Human fights Accessibility Committee. Other recent improvement projects at Sheldon Pool <br /> include a new fi e alarm system, new emergency lighting, and automatic door openers. <br /> At Echo Hollow Pool, improvements include a new roof, family change rooms, a new fire alarm <br /> system, new em rgency lighting, and automatic door openers. <br /> <br /> II Energy fficiency improvements at Echo Hollow Pool, Sheldon Pool and Sheldon Community <br /> Center should r sult in a 40% energy savings. The project included upgrades to lighting, heating and <br /> ventilation syste sand the addition of computerized controls at both locations. Solar water heating was <br /> added to Sheldo Pool. <br /> The ope house events at both pools will include informational displays and light refreshments. <br /> ublic Works • Administration • City of Eugene • 858 Pearl Street • Eugene, OR 97401 <br /> Phone: (541) 682-5262 • FAX: (541) 682-6826 • www.ci.eugene.or.us <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.