News Releas West Alton Baker Park Plan <br /> May 30, 199 <br /> Page 2 <br /> • No ew daily vehicle access bridge across the canoe canal, south of WISTEC. A <br /> <br /> ~ proposed ne pedestrian and bicycle bridge, which can accommodate emergency vehicles, will <br /> be built over he canal south of WISTEC. Public access to the accessible parking and performer <br /> entrance at C thbert Amphitheatre will continue along Day Island Road, from the existing <br /> parking lot est of the amphitheatre. <br /> • A n w potential site for a future Outdoor Program/ River House has been identified <br /> <br /> I <br /> <br /> ~ south of the arge existing parking lot. <br /> • Fu a parking lot access was removed from in front of the WISTEC building to allow <br /> for landscap' g, pond, and outdoor science park development. <br /> The ublic record will be kept open for comment until June 11, during which time the <br /> developmen plan may be viewed by people unable to attend the meeting. The plan may be <br /> viewed at th Eugene Parks Planning office, 1820 Roosevelt Boulevard. <br /> <br /> i <br /> The eeting location is accessible to wheelchairs. Assisted listening devices are <br /> available for people with hearing impairments, and an interpreter can be provided with two <br /> working day 'notice prior to the hearing. To arrange for these services or for more information <br /> regarding th meeting, call Public Works Maintenance at 682-4800. <br /> <br />