t[@t' <br /> • C <br /> f <br /> I. <br /> construction of the new bicycle/pedestrian suspension bridge. <br /> By late July, the contractor is scheduled to be pile driving in Alton Baker Pazk f anchor <br /> supports for the new bike/pedestrian suspension bridge on the north bank. The riverside bike <br /> path will be detoured and bikes and pedestrians will be re-routed around the reflecting nd, then <br /> west to rejoin the existing bike path north of the construction: <br /> Calling the City's traffic relief hotline at 984-8484 is the quickest way to get dail <br /> <br /> up-to-date information about detour routes and information on how daily traffic will be ected <br /> <br /> by construction in the Ferry Street Bridge corridor. <br /> You may also call the project office at 682-8449. Staffwith the Ferry Street Bri ge <br /> <br /> Team generally is available to answer questions Monday through Friday, 8 a.m. to 5 p. <br /> Work on roads and traffic signals north of the Willamette River will start in mid- 998 and <br /> C <br /> <br /> continue into 1999. E <br /> LTD will operate all routes across the Ferry Street Bridge throughout the constru tion. <br /> For route and schedule information, call LTD at 687-5555. . <br /> 7 <br /> <br />