New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1997
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:45:30 PM
Creation date
8/5/2008 11:32:39 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> C ~ ~ <br /> News Release Riverbank Bike Trail Extension <br /> July 9, 1997 <br /> Page 2 <br /> The O osso-to-Beltline portion of the path is being built by the developers of Valley <br /> ' ~ River Village s part of their development project. Construction is planned to occur this year. <br /> When the pri ately built portion of the path has been completed, it will be dedicated to the City, <br /> ' which will m intain it as part of the public riverside path system. <br /> The la t major expansion of Eugene's 26-year-old riverside bike path system was in the <br /> early 1980s, hen the portion along the west bank of the Willamette from the Greenway bike <br /> bridge to the wosso bridge was constructed. <br /> ~I <br /> I <br /> I <br /> II <br /> i <br /> I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.