New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1997
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:45:30 PM
Creation date
8/5/2008 11:32:39 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> t <br /> ~1~,~1~r~~/mil/~~iT~~~ <br /> II/I`"~///////`~`~/ <br /> Public Works <br /> Administration <br /> City of Eugene <br /> 858 Pearl Street <br /> Eugene, OR 97401 <br /> (503) 687-5262 <br /> March 5, 199 <br /> CONTACT: ames Ollerenshaw, Technical Services Manager, Wastewater Division, 682-8604 <br /> From Public I formation Section, 682-5523 <br /> FOR IMME IATE RELEASE <br /> PUBLIC C N REVIEW DRAFT HYUNDAI WASTEWATER DISCHARGE PERMIT <br /> The Eu ene Public Works Wastewater Division will hold two public information <br /> meetings in M ch to provide an opportunity for area residents to review and comment on a <br /> proposed avast ater discharge permit for the Hyundai semiconductor manufacturing plant in <br /> west Eugene. <br /> The firs "drop-in" session will be held Monday, March 10, from 2:30 to 7:30 p.m., and <br /> the second sess on will be Thursday, March 20, from 4 to 7:30 p.m. Both sessions will be held <br /> in the Sloat Ro m on the ground floor of the Atrium Building, 99 West 10th Avenue. <br /> The Cit 's industrial wastewater control program requires significant industrial users of <br /> (he regional w tewater collection and treatment systems to obtain wastewater discharge permits. <br /> II'I The draft perm for phase 1 of the Hyundai facility includes limits on the amount of specific <br /> ~hemicals that c be discharged from the plant. It also sets monitoring requirements for the <br /> plant and requir s plans to be in place for operating and maintaining an onsite wastewater <br /> treatment syste and handling solvents and toxic materials. <br /> ' (more) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.