New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1996
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:45:39 PM
Creation date
8/5/2008 10:56:10 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
September 6, 1996 <br /> Public Works <br /> CONTACT: Bob Terrel, Project Manager, 687-5560 Administration <br /> City of Eugene <br /> 858 Pearl Street <br /> From Public Information Section, 687-5523 Eugene, OR 97401 <br /> FOR IMMEDIATE RELEASE (503) 687-5262 <br /> PAVING PROJECTS TO START ON THREE MAJOR STREETS <br /> Work is scheduled to begin Monday, September 9, on the first of three projects to repave <br /> portions of several major streets in Eugene. <br /> The first project is the resurfacing of Amazon Parkway between 29th to 19th avenues and <br /> 19th Avenue between Pearl and Willamette streets. Broken sections of paving will be dug up <br /> and replaced, the edges of the existing pavement will be ground off using a process called <br /> rotomilling, and atwo-inch layer of new asphalt concrete paving will be applied over the entire <br /> width of the roadway. <br /> Similar work will be done on Coburg Road from Beltline Road to Kinney Loop. Wildish <br /> Construction Co. will be doing both the Coburg Road and Amazon Parkway jobs, and crews will <br /> move to Coburg Road as each phase of the work on Amazon Parkway is completed. Excavation <br /> on Coburg Road tentatively is scheduled to start September 16. <br /> Construction hours for the Amazon Parkway and Coburg Road jobs are 7 a.m. to 10 p.m. <br /> On Amazon Parkway, during the excavation and rotomill phases, only one lane of traffic will be <br /> open in the construction areas. For the several days that paving is taking place, Amazon <br /> Parkway will be closed to all through traffic between 18th and 29th avenues. At least one lane <br /> <br /> will be kept open on 19th Avenue, but motorists may encounter delays and detours. Patterson <br /> <br /> and Hilyard streets are recommended alternative routes for northbound and southbound traffic. <br /> (more) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.