<br /> j September 18, 1996 <br /> ' Public Works <br /> CONTACT: Bob Terrel, Project Manager, 687-5560 Administration <br /> City of Eugene <br /> 858 Pearl Street <br /> From Public Information Section, 687-5523 Eugene, OR 9740y <br /> FOR IMMEDIATE RELEASE (503) 687-5262 <br /> TRAFFIC ADVISORY: PAVING WORKS STARTS ON WEST 11TH <br /> Paving construction is scheduled to begin Thursday evening, September 19, on West 11th <br /> Avenue between Tyinn Street and Beltiine Road. <br /> The contractor on the West 1 Ith resurfacing project, Eugene Sand & Gravel, anticipates <br /> that the main paving activity will take approximately seven days to complete. Most of the work <br /> will be done at night, and flaggers will direct traffic at major intersections. <br /> Work hours are 6 p.m. to 6 a.m. At least one of traffic will be maintained in each <br /> direction on West 11th, and intersections and driveways will be kept open except for brief <br /> periods when construction equipment is in an intersection or in front of a driveway. <br /> Traffic signals will not operate on a normal cycle during the construction project, and <br /> motorists are asked to be extra-cautious when flaggers and other construction workers are in the <br /> roadway. Motorists are advised to use alternate routes such as Roosevelt Boulevard to avoid <br /> construction delays. <br /> For current information on this and other City construction projects, call the traffic relief <br /> hotline at 984-8484. <br /> <br />