10/14/93 10:31 $503 683 6826 EUG PUBLIC WORKS f~001 <br /> <br /> • 'w <br /> ~%K7k~e~k~tNc~%#~ffi~k~k~k~COk~k&~e*~SBC~NcSkok~K <br /> ~m~e ERROR TX REPORT <br /> ~~x~~~~e~~c~~*~x~~:~r*a~~c~x~~~~~~x~~ <br /> TX FUNCTION WAS NOT COMPLETED <br /> I <br /> TX/RX NO. 2219 <br /> CONNECTION TEL 9 683 7631 <br /> i <br /> CONNECTION ID REGISTER-GUARD ~ ~ <br /> ~ START TIME 10 / 14 10:31 ~ yam„ ~ <br /> USAGE TIME 00' 00 ` ~ • ` -JJ <br /> PAGES 0 <br /> RESULT NG <br /> 0 #018 <br /> i <br /> ~~'i st '~~¦¦i~ ~i it r '~i` <br /> i <br /> Public Works <br /> Admin'~stration <br /> City of Eugene <br /> OCTOBER 14, 1993 858 Pear! Street <br /> Eugene, OR 97407 <br /> {503) 687-5262 <br /> CONTACT; Bob Noble, Traffic Operations Supervisor, 687-5242 <br /> Dpn Blaclanore, Traffic Technician, 465-2681 <br /> rrotn Y'ubirc Information Section, 6875523 <br /> FOR IMIVCEDiAmE RELEASE <br /> I3II~5, CAitS SHA'RF LANE ON' EAST 13'I'H <br /> Bigyclists and motorists are being asked to share the sixeet literally at two xecently <br /> signed intersections on East 13th Avenue. <br /> Tn ordex to provide room for tlt.xee vehicle travel lanes and the recently installed through <br /> lane for bicycles, the bicycle lane and. the right-turn pockets on X3th Avenue at Pearl Street and <br /> at Patterson Street axe combined into one lane. The bike/turn Iane has been marked with paint <br /> on the street, and signs have been pasted alexting caxs and bikes of the share lane. <br /> The combined lane is 11 feet wide and ixacludes a full-lane, right-turn pocket for <br /> motorists and a 5-foot-wide through bicycle lane within the turn Iane. Motorists may occupy <br /> the entire width of the lane, but they must yield to bicyclists already present. Bicyclists entering <br /> <br />