New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1993
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:43:55 PM
Creation date
8/5/2008 9:30:40 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
li <br /> News Release Harlow Road Overpass <br /> April 2~, 1993 <br /> Page 2 ' <br /> the bri ge-widening project. OBEC Consulting Engineers of Eugene has been <br /> hired t provide project design and construction management services. <br /> Partici ating in funding for the project are the cities of Eugene and <br /> Springfield, Lane County, the state of Oregon, and the Oregon Department of <br /> Transpo tation. <br /> Wh n completed, the widened overpass will include a traffic lane in each <br /> directioln plus bike lanes and full-width sidewalks on both sides of the <br /> bridge. I~' <br /> In 1991, during the first phase of the project, Harlow Road was widened <br /> between arden Way and Beverly Street, bike lanes and left turn lanes were <br /> added, new curbs and sidewalks were installed, guard rails were replaced, and <br /> <br /> street lighting was improved. <br /> ~II <br /> III <br /> I <br /> I~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.