New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1994
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:44:35 PM
Creation date
8/4/2008 3:39:21 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1994
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
News Rel a Summer Street Repairs <br /> July 12, 19 4 <br /> Page 2 <br /> Ove lay work typically involves several stages: removing the top layer of pavement; <br /> ~ r and makin other re airs as necessaz • and a 1 in the new la er of avin . <br /> fixing cub g p Y, PP Y g Y P g <br /> Streets are losed to through traffic during paving until the new pavement has cooled, <br /> typically t o to four hours. Streets scheduled for overlay work aze: Harlow Road from <br /> Coburg Ro d to Garden Way; Adams Street from 19th to 22nd avenues; Adkins Street from <br /> Coburg to Willakenzie roads; Buck Street from 18th to 21st avenues; Greiner Street from <br /> i <br /> 18th to 21 t avenues; Figueroa Street south of Elmira Road; Gilbert Street from Elmira to <br /> Bell Aven e; Wellington Street from Wood to Bell avenues; Sierra Street from Elmira Road <br /> to Bell Av nue; Hughes Street from Wood to Royal avenues; and Bell Avenue from Baxter to <br /> Gilbert str ts. <br /> a <br /> Str is receiving a slurry seal treatment are closed to all traffic while the sealing <br /> material d ies, typically eight to twelve hours. Streets scheduled for slurry seals are: Ferry <br /> Street fro 33rd to 36th avenues; Mill Street from 34th Place to 36th Avenue; High Street <br /> i <br /> from 34th to 36th avenues; 34th Place from High to Ferry streets; 34th Avenue from Hilyard <br /> to High S eet; Fifth Avenue from Market Street to Bailey Hi11 Road; Seventh Avenue from <br /> Seneca S eet to Bailey Hill Road; Market Street from Fifth to Seventh avenues; the streets in <br /> the Peppe tree subdivision off West 18th Avenue; and portions of Musket, Powderhorn, and <br /> Flintlock treets off Crescent Avenue. <br /> ~ In ddition to the contracted overlay and slurry seal work, Public Works crews are <br /> <br /> ;i <br /> scheduled to perform a variety of ongoing street maintenance services this summer. <br /> Typically the maintenance crews work from 7 a.m. to 4:30 p.m. Streets are normally kept <br /> open alth ugh there may be lane closures in the construction area. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.