w <br />'' <br />News Rele se -- River Road Construction Begins <br />June 18, 990 <br />Page 2 <br />The wo construction firms bid a total of $3.8 million to install sewers <br />in the th ee basins. The combined total was approximately 14 percent below <br />the city' pre-bid estimate. lane County is paying the cost of repairing or <br />reconstru ting streets after sewers are installed. River Road property <br />owners wi 1 be assessed for the cost of sewer installation. The City esti- <br />mates the total cost for the owner of a 9,200-square-foot lot at around <br />$5,400. hat estimate includes all public and private sewer-related costs. <br />Cons ruction activity normally takes place during daylight hours, Monday <br />through S turday. Occasionally work may be scheduled at other hours or on <br />Sunday. esidents will be notified before work begins on their streets. <br />Port ons of streets may be closed to through traffic during construc- <br />tion. Th project boundaries were designed to minimize the impact on the <br />River Roa area during the next three years of construction. The project <br />boundarie also take into account the traffic detours related to Lane Coun- <br />ty's road projects on River Road and Maxwell Road. <br />In a <br />uled to b <br />are some <br />area to t <br />property <br />notices t <br />Eighteen- <br />summer wi <br />Hilliard, <br />Elm (east <br />Skipper <br />Sunview, <br />Idition to the sewers being constructed this year and those sched- <br />built over the next six years in River Road and Santa Clara, there <br />existing sewers, including an interceptor system that connects the <br />ie regional wastewater treatment system on River Avenue. River Road <br />owners whose properties are along existing sewer lines will receive <br />its summer giving them 18 months to hook up to the sewer system. <br />ionth notices to property owners along lines being constructed this <br />~1 be sent later this year. <br />TENTATIVE CONSTRUCTION SCHEDULE FOR JUNE AND JULY <br />BASIN A <br />Apple, Jayne, Lund, Willa, Marion, Custer, Hoover, Beebe. <br />BASIN B <br />~, Maywood, Linwood, Hemlock, Elm (west), Alderwood. <br />BASIN C <br />past), Greg Way (north), North Park (Silver to Sunview), Ivy, <br />Dreg Way (south), North Park (Maxwell to Sunview), Armstrong. <br />#### <br />', <br />