New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
River Road 1991-1993
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
River Road 1991-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:33:19 PM
Creation date
8/4/2008 2:01:53 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />°» <br />;' PUBLIC WORKS <br />ENGINEERING <br />SENT • 858 PEARL ST. EUGENE, OREGON 97401 • (503) 687-5291 <br />NEWS RELEASE <br />May 11, 199 <br />CONTACT: E is Jones, River Road/Santa Clara Public Information, 687-8823 <br />FOR IMMEDIA E RELEASE <br />CITY OPENS BIDS ON RIPER ROAD SEWER CONSTRUCTION PROJECT <br />James W. Fowler Co., of Dallas, Ore., is the apparent low bidder for a <br />contract t construct sanitary sewers in the River Road area this summer. <br />I <br />The c nstruction company bid $990,548 to install sewers in Basin A, a <br />residentia neighborhood bounded by West Hilliard Lane, Sunnyside Drive, <br />Willow Str et, and River Road. The company's bid is 24 percent below the <br />city of Eu ene's estimate of $1.3 million. <br />The 6 sin A project drew seven sealed bids, which were opened Friday <br />morning by city Project Manager Michelle Cahill. The bids ranged from <br />Fowler's low bid to a high bid of $1.47 million. The other bidders were <br />Bonstan C nstruction Co. of Clackamas; Casper & Magera of Spokane, Wash.; <br />Emery & S ns Construction, Inc., of Stayton; Eugene Sand & Gravel, Inc., of <br />Eugene; T ny Russell Construction, Inc., of Othello, Wash.; and Wildish <br />Corvallis Construction Co. of Eugene. <br />Proj <br />completed <br />ct specifications call for sewer work to begin this summer and be <br />within 75 days. Final street repairs will be completed in 1991. <br />more <br />
The URL can be used to link to this page
Your browser does not support the video tag.