New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1992
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:43:45 PM
Creation date
8/4/2008 11:54:00 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works <br /> <br /> ~r City of Eugene <br /> 858 Pearl Street <br /> Eugene, Oregon 97401 <br /> (503) 687-5262 <br /> NEWS R E L E A S E <br /> eptember 24, 1992 <br /> ONTACT: B b Terrel, Project Manager, 687-5382 <br /> rom Sue Rhyn ,Public Information Assistant, 687-5548 <br /> OR IMMED TE RELEASE <br /> DE OUR AT COBURG ROAD AND SIXTH AVENUE OFF-RAMP <br /> A road c nstruction detour will be in effect for southbound traffic on Coburg Road near <br /> e Sixth Avenu exit beginning at 9:00 p.m. on Friday, September 25. Signs will direct traffic <br /> est on Sixth A enue to Pearl Street and left on Pearl to Seventh Avenue to avoid the <br /> onstruction ar .The street will be closed until approximately 4:00 a.m. on Saturday. <br /> Eugene and and Gravel is the contractor for the construction work. Crews will be <br /> emoving and r lacing a street joint that crosses both southbound lanes on Coburg Road about <br /> 0 feet past the ixth Avenue exit. The joint repair is due to normal deterioration. The $6,000 <br /> epair is paid fo with street rehabilitation funds and is part of Eugene Public Works Department's <br /> treet overlay pr ject. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.