<br /> lr ~ ` <br /> A plan ecologist recently surveyed the area and found that becuase the <br /> site had been disturbed previously, there were no remaining natural plants. <br /> The city h pes to improve the site by planting grasses in the bottom and <br /> along the ides of the Swale and by reintroducing willows near the banks of <br /> the Ponds. <br /> The oodpasture Island Road construction work, including the water <br /> quality pr ject, is scheduled to be completed by November 1. <br /> # # # <br /> <br />