New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Airport 1989-1993
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
Airport 1989-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:33:52 PM
Creation date
8/4/2008 10:40:31 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Airport
PW_Subject_Public_Affairs
Airport
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br /> <br /> a <br /> PUBLIC WORK DEPARTMENT • 858 PEARL • EUGENE, OREGON 97401 <br /> NEWS RELEASE <br /> !May 17, 1988 <br /> 'CONTACT: Sa dra Gleason, Public Information, 687-5523 <br /> FOR IMMEDIA E RELEASE <br /> CELE RATION MARKS BEGINNING OF CONSTRUCTION ON AIRPORT TERMINAL <br /> On Mon ay, May 23, at 1 p.m. in the main lobby of the Mahlon Sweet <br /> ('Airport, th city of Eugene will host a ceremony for the community celebrating <br /> the beginni g of construction on the airport terminal. <br /> Speake s include Jim Hartigan, vice-president of San Francisco's regional <br /> office for nited Air Lines; Matt Cavanaugh, civil engineer of the Federal <br /> Aviation Ad inistration, Seattle, Washington; Eugene Mayor Brian B. Obie; <br /> Robert Boul on, chair of the Aviation Commission; and Orlando Hollis, chair <br /> of the Cham er of Commerce Aviation Committee. <br /> During the ceremony, Obie will unveil the new Mahlon Sweet luggage <br /> I!, stickers an the air-form boards that will be placed on the walls of the <br /> terminal du ing construction. Airport users will be encouraged to place <br /> j flying or t avel-related quotes on the board. At the conclusion of the <br /> ceremony, t e public will be invited to write a quote on the boards or to sign <br /> their names <br /> or to sign he board. Cadets from the Mahlon Sweet Composite Squadron of the <br /> ~ Civil Air P trol will participate in the celebration. <br /> I <br /> The Z2 .2 million, two-and-one-half year project is funded through a <br /> combination of local, state, and federal revenues and includes reconstruction <br /> ~ of the park ng lot and road systems, the expansion of the terminal, air side <br /> improvement, and installation of a storm and sanitary sewer system. <br /> Landsi~e construction, the first phase of the project was completed in <br /> October, 19 7. Improvements include 1.8 miles of new roads, a covered walkway <br /> I <br /> more <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.