New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Airport 1989-1993
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
Airport 1989-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:33:52 PM
Creation date
8/4/2008 10:40:31 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Airport
PW_Subject_Public_Affairs
Airport
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
News Relea a Airlines Move into Temporary Quarters <br /> "'July 25, 1 88 <br /> Page 2 <br /> bridges, a d an observation deck. The new terminal will have a 200-foot long <br /> automated baggage claim system and more room for restaurants, gift shops, and <br /> other airport services. <br /> ~I <br /> The terminal expansion is the second phase of a two-and-one-half year, <br /> $20.2 million project that, in addition to the terminal remodel, includes <br /> reconstru tion of the parking lot and road systems, airside improvements, <br /> and installation of storm and sanitary sewers. Landside construction was <br /> completed in October, 1987, with 1.8 miles of new roads, a covered walkway <br /> from the arking areas to the terminal, rental car and parking control <br /> buildings, and over 40,000 trees and shrubs. <br /> The estaurant, gift shop, and all other airport services will remain in <br /> operation throughout the construction. <br /> <br /> i <br /> II <br /> i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.