News Relea a Airlines Move into Temporary Quarters <br /> "'July 25, 1 88 <br /> Page 2 <br /> bridges, a d an observation deck. The new terminal will have a 200-foot long <br /> automated baggage claim system and more room for restaurants, gift shops, and <br /> other airport services. <br /> ~I <br /> The terminal expansion is the second phase of a two-and-one-half year, <br /> $20.2 million project that, in addition to the terminal remodel, includes <br /> reconstru tion of the parking lot and road systems, airside improvements, <br /> and installation of storm and sanitary sewers. Landside construction was <br /> completed in October, 1987, with 1.8 miles of new roads, a covered walkway <br /> from the arking areas to the terminal, rental car and parking control <br /> buildings, and over 40,000 trees and shrubs. <br /> The estaurant, gift shop, and all other airport services will remain in <br /> operation throughout the construction. <br /> <br /> i <br /> II <br /> i <br /> <br />