New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1986
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 2:43:19 PM
Creation date
8/4/2008 10:27:09 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NEWS RELEASE <br /> i <br /> June 5, 1 86 <br /> Contact: Bob Helling, 687-5240 <br /> Sandra Gleason, 687-5523 <br /> FOR IMMED ATE RELEASE <br /> PIPE INSTALLATION CLOSES STREET <br /> Amaz n Parkway between 19th Avenue and 24th Avenue will be closed, <br /> Tuesday, une 11 and Wednesday, June 12 as crews install a 30-inch water <br /> main. <br /> Euge a Sand and Gravel will place barricades at both 19th and 24th <br /> Avenues t close Amazon Parkway while construction is in progress. <br /> North and south bound traffic should use Willamette and Hilyard streets. <br /> Inst llation of the water main is part of the Eugene Water and Electric <br /> Board's p ogram to upgrade the city's water system by replacing old and <br /> leaking c st-iron lines with larger, concrete pipes. <br /> Call 687-5240 for information. <br /> <br /> i ! END <br /> <br /> 'I <br /> i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.