New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1988
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:41:48 PM
Creation date
8/4/2008 10:04:39 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NEWS RELEASE <br /> July 15, 988 <br /> CONTACT: Bob Terrell, Chief Inspector, 687-5382 <br /> ick Bates, Construction Inspector, 687-5230 <br /> FOR IMMEDI TE RELEASE <br /> R00 EVELT CONSTRUCTION TO CAUSE TRAFFIC DELAYS ON HIGHWAY 99 <br /> On Su day, July 17, Hamilton Electric will install conduit for the <br /> new traffic signals planned at the intersection of Roosevelt Boulevard and <br /> Highway 99. Trenching will begin at 6 a.m. and will be completed by 5 p.m. <br /> Moving from east to west on Roosevelt across Highway 99, one lane of <br /> <br /> 4 traffic at time will be closed. The trench will be backfilled before the <br /> ';crew moves egins work in the next lane. Flaggers will direct traffic <br /> throughout t e day. <br /> The rec nstruction of Roosevelt is the final phase of a three-year <br /> ,project to p ovide an east/west arterial connecting Beltline Road and <br /> ';Highway 99. During the reconstruction, Wildish Corvallis Construction Co., <br /> contractor f r the project, will rebuild the existing roadbed, widen the <br /> street to include two travel lanes and two turn pockets, and install new <br /> traffic signs s at the intersections of Seneca and Roosevelt Boulevard. <br /> the $700,000 roject is paid for through state and federal dollars. <br /> Eventual y, the road will connect to the Chambers Connector at the east <br /> end of Roosev lt, providing a link with River Road/Santa Clara and central <br /> Eugene. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.