New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1989
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:42:03 PM
Creation date
8/4/2008 9:58:26 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
News Rel ase Riverfront Proposals <br /> <br /> ~ May 31, 989 <br /> Page 2 <br /> Tas s associated with the geometric and traffic engineering design <br /> proposal include performing technical traffic analysis for developing street <br /> i <br /> designs nd traffic operational features, preparing conceptual plans for <br /> i <br /> geometric and traffic designs for all intersections and access roads into the <br /> Research ark, evaluating alternative pedestrianjbicycle design features for <br /> the Frank in Boulevard corridor, and upon approval of a preferred conceptual <br /> plan, pre aring the preliminary plans for geometric and traffic design. In <br /> addition, the consultant will be asked to prepare the final bid documents to <br /> be used i contracting the installation of six traffic signals at the major <br /> access to ations to the Park. <br /> The hind request for proposal is for design of drainage structures and <br /> bridge(s) over the Millrace and a new railroad underpass for vehicles. <br /> `~rr <br /> Consultan tasks will include reviewing the preliminary site plan for <br /> developme t of structural design alternatives, conducting geotechnical <br /> studies a d analysis for structural foundation design, and completing the <br /> prelimina design. After approval of the preliminary design, the consultant <br /> will prep re the final design to be used in bid documents for construction. <br /> Each roposal will include the preparation of the bid documents that <br /> ~ will be us d to contract for the construction phase of the project. Separate <br /> proposals ill be invited for the actual construction. <br /> j more <br /> I <br /> i <br /> ~r <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.