<br /> i~ <br /> <br /> i <br /> <br /> i <br /> <br /> i <br /> NEWS RELEASE <br /> June 13, 989 <br /> CONTACT: Ivan Koehn, Construction Manager, 687-5230 <br /> From Sand a Gleason, Public Information, 687-5523 <br /> FOR IMMED ATE RELEASE <br /> <br /> i <br /> CITY 0 OVERLAY COBURG ROAD FROM FERRY STREET BRIDGE TO OAKWAY ROAD <br /> Begi Wing the week of June 19, Wildish Corvallis Construction Co. will <br /> begin ove laying Coburg Road from the Ferry Street Bridge north to Oakway <br /> <br /> i <br /> Road. Co struction activity will be limited to evening hours between 8 p.m. <br /> and 6 a.m Monday through Friday. Completion is scheduled for approximately <br /> July 7. <br /> Duri g the first of two phases, the contractor will begin on the west <br /> half or s uth bound lane of Coburg Road. Southbound traffic will be detoured <br /> at Oakway Road and Coburg Road onto Southwood Drive, looping back to Coburg <br /> Road at t e north end of the Ferry Street Bridge. The I-105 off ramp onto <br /> Coburg Ro d will be closed. North bound traffic will not be affected by this <br /> phase of xcavation and construction. <br /> Duri g phase two, both north and south bound traffic, from the Oakway <br /> <br /> ~ and Cobur Road intersection to the Ferry Street Bridge, will be switched to <br /> <br /> ~ the west alf of the road, with one lane each for north and south bound <br /> motorists During this phase, access east onto Centennial Boulevard will be <br /> closed to north bound traffic. The east bound I-105 ramp to Springfield will <br /> be closed to north bound and south bound traffic. During phase two, the east <br /> bound acc ss onto I-105 will only be available from the Washington and <br /> <br /> ~ Jefferson Street Bridge interchange. <br /> <br /> i more <br /> <br />