EXHIBIT A <br /> Summary of Estimate for Services <br /> OBEC Consulting Engineers <br /> POLK STREET WATER QUALITY VAULT <br /> CITY OF EUGENE <br /> CONSTRUCTION ENGINEERING <br /> Billing Estimated <br /> Personnel Hours ate Cost <br /> Chief Construction Engineer 1 $155.00 $155 <br /> Construction Group /Project Manager 5 32 $130.00 $4,160 <br /> Senior Project Engineer 4 $115.00 $460 <br /> Project Engineer 4 16 $105.00 $1,680 <br /> CADD Manager 0 ~ $85.00 $0 <br /> Senior CADD Technician 0 $78.00 $0 <br /> Survey Group Manager 0 $105.00 $0 <br /> Senior Project Surveyor 0 $95.00 $0 <br /> Survey Technecian 3 0 $78.00 $0 <br /> Assistant Project Manager 76 $105.00 $7,980 <br /> Senior Engineering Technician 148 $95.00 $14,060 <br /> Engineering Technician 2 0 $78.00 $0 <br /> Engineering Technician 1 0 $64.00 $0 <br /> Administtrative Assistance 3 22 $64.00 $1,408 <br /> 299 $29,903 <br /> Direct Nonsalarv Costs <br /> a. Travel and Per Diem <br /> Mileage: 250 miles @ $0.505/mi = 268 <br /> Per Diem: None Anticipated = 0 <br /> <br /> ' $ 268 $268 <br /> b. Reproduction Expenses $34 <br /> c. Survey Supplies, monuments,stakes,etc. $0 <br /> d. Equipment Expense $0 <br /> e. Concrete Cylinder Testing $0 <br /> g. Outside Consultant: <br /> None Anticipated $0 <br /> Subtotal $302 <br /> i Jf' 1• 1t'~YEff~ t~•4~ .Xy <br /> <br /> I <br /> <br />