Run Date: 9/10/2008' <br /> I <br /> TOTAL DIRECT COST DISTRIBUTION (Includes 5Y. admin fee on CRy Shre) Ordinance Worksheet <br /> 1. <br /> PAVING CONCRETE CURBrGUTTER CRY PAVE CtIYSCAPE CRY STORM CITYWW ADkONFEE TeglCealsba4a <br /> Job No. 93-009527 <br /> Concrete Paving, Wastewatej QTALOIRECTCOSTOISTRIBUigN $ 109,816.10 $ # - $ - $ $ 1a,016.54 S 45,952.58 $ 189,58532 # {1,979:03 <br /> # 187,819 <br /> TOTAL ASSESSMENT SNARE <br /> Line <br /> <br /> K~ Description PAV94G CONCRETE CURBIGIJiTER CRY PAVE CRYSCAPE CITY STORM GRYWW TOTAL <br /> 10 MOBILIZATION DELAYED ASSESSMENTS $ - $ - $ - $ - <br /> 20 TEMP. PROTECTION ON HOLD ASSESSMENTS <br /> $ - <br /> 30 EROSION CONTROL ASSESSABLE $ 109,616.10 $ - # $ - $ $ - ; 109,fi18.10 <br /> 40 8 IN- SOBGRADE ST <br /> 50 72 INCH SADDLE ESSMEHi $ 109,616.10 # - $ - $ - $ $ # - $ 109,818.10 <br /> 60 CATCH BASINS <br /> 70 MINOR ADJUSTMENT CITY OF EUGENE SHARE <br /> Ordinance Worksheet <br /> 80 GENERAL EXCAVATIO nem13. <br /> 90 12 INCH PVC STORM PAV9~i. ClN4GRETE Cl#tBIGUTTER CITYPAVE CITYSCAPE CRY STORM 'C(IY1MN AOY94.FEE CTtYSHA~wIo <br /> Fee FUwnoeF F94APK9 <br /> 100 10 INCH PVC STORM STORMSDC $ 14,016.54 <br /> $ (4,016.54 $ (46256 $ 13,553.98 $ 3; <br /> 110 8 INCH PVC WASTEWP; PORTATpNSDC $ - $ - $ - $ $ # - $ - $ - $ <br /> 120 6 INCH WASTEWATER <br /> $ 45,952.58 45,95258 (1.518.47 $ 44,436,11 $ 1,0! <br /> 130 WATER QUALITY STRU WAS7EWATERUTLRY <br /> 190 LEVEL 2 , 1/2 INCH STORM-UTILRY <br /> 150 PLAIN CONCRETE PVM LOW-NCOMESUBSIDY $ - <br /> 160 TOPSOIL ROUNDING (IF NEEDED) , <br /> $ - <br /> TOTAL: <br /> I <br /> AI,Gf1Y5fU4RE # - - $ - $ $ - $ 14,016.54 $ 45;95258 $ 59,9.12 $ (1,979.03 3 57,890A9 $ 1,3< <br /> NOTECRYSHAREWCLUDESINIERSEC710NS,E7fiRAW~TH,ANDS%iRACOSTFORCONCRETEWTERSECTpA1S <br /> ~ Note: Manually eMerlow-income subsidy v <br /> Note: These cells are linked to the'Cost Distribution" and "Assessment Tabulation" and should I <br /> • - - <br /> 4 _ - - _ _ - - - <br /> <br />