<br /> Run Date: 09/23/2008 13:29:09 City of Eugene <br /> Engineer's Estimate AA / / <br /> Estimate: Engineers Estimate <br /> Job 93-004527 6th Alley Between Tyler 6 Polk y _ <br /> Line No. Description Quantity Unit Unit Price Amount <br /> 6th Alley Between Tyler 6 Polk <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $11,500.00 $11,500.00 <br /> 0020. TEMP. PROTECTION AND DIRECTION OF TRAFFIC 1.00 LUMPSUM $7,500.00 $7,500.00 <br /> 0030. EROSION CONTROL 1.00 LUMPSUM 5600.00 5600.00 <br /> 0040. 8 IN. SUBGRADE STABILIZATION 159.00 SQYD 513.00 $2,002.00 <br /> 005D. 72 INCH SADDLE MANHOLE OVER EX PIPE 1.00 EACH $8,500.00 $8,500.D0 <br /> 0060. CATCH BASINS 1.00 EACH $2,000.00 S2,OOD.DD <br /> 0070. MINOR ADNSTMENT OF MANHOLES 1.00 EACH 5400.D0 $400.OD <br /> D080. GENERAL EXCAVATION 205.00 CUYD $30.OD $6,150.00 <br /> 0090. 12 INCH PVC STORM PIPE 168.00 FOOT $95.00 $7,560.00 <br /> 0100. 10 INCH PVC STORM PIPE 11.00 FOOT $92.00 $962.00 <br /> 0110. 8 INCH PVC WASTEWATER PIPE 367.00 FOOT $55.00 $20,185.00 <br /> 0120. 6 INCH WASTEWATER SERVICE LINE 56.00 FOOT $45.00 $2,520.00 <br /> 0130. WATER QUALITY STRUCTURE 1.00 EACH $15,000.00 $15,000.00 <br /> 0140. LEVEL 2 1/2 INCH DENSE, HMAC MIXTURE 25.00 TON $85.00 $2,125.00 <br /> 0150. PLAIN CONCRETE PVMT, UNDOWELED, 7 IN. THICK 5,164.00 SQFT $9.00 $96,976.00 <br /> 0160. TOPSOIL 1.SD CUYD $30.00 $45.00 <br /> Total General $133,025.00 <br /> Total 6th Alley Between Tyler b Polk $133,025.00 <br /> 6th Alley Between Tyler & Polk - Other / Direct <br /> General <br /> DO10. Permits LUMPSUM $2DD.DD <br /> 0020. CONTINGENCY 10~ of Contract $13,3D2.5D <br /> 0030. Advertising 1.00 LUMPSUM $600.00 5600.00 <br /> 0090. test 1.00 LUMPSUM $1,200.00 $1,200.00 <br /> Total General $15,102.50 <br /> Total 6th Alley Between Tyler 6 Polk - Other / Direct $15,102.50 <br /> 6th Alley Between Tyler S Polk - Miscellaneous <br /> General <br /> 0010. Engineering Charge 23~ of Direct $34,069.33 <br /> 0020. Construction Financing 3.51198 of Direct $5,202.21 <br /> 0030. Finance Admin Fee 5~ of Direct 57,406.38 <br /> Total General $46,677.92 <br /> Total 6th Alley Between Tyler & Polk - Miscellaneous $46,677.92 <br /> Total Engineers Estimate $194,805.42 <br /> _ _ - <br /> <br />